top of page
GERMANY
REICHENBACH,
GERMANY
05 / 14
The reconstruction of the object was divided in two parts. The first part was renovation and restoration of the old building with yellow brick facade, and the second part was the addition of the new building (on the right) with aluminum ribbed plates and the part in between that connected them. Both buildings were reconstructed according to the latest codes for energy efficiency and environmental protection. The old building got new roof equipped with solar panels. The windows and doors are with double panned. A big part of the school yard was left with grass and green surface to reduce the water run-off
bottom of page


